A35 HIGHWAY - MILANO BRESCIA (BREBEMI)
… a modern highway realized in PPP …

This PPP project developed within the “infrastructural corridor 5” along the High-Speed Torino-Trieste railway line (Milan-Verona section), aims at the implementation of a direct link among Brescia, Bergamo and Milan, in the most industrialized area of the country. The BreBeMi is a three lanes highway, in addition to the emergency lane, for a total length of 50 km. In addition to the highway section, the project includes 50 km of urban roads.
The design impacts an area between the highway section and the railway line of about 160 hectares, for which a specific resettlement and restoration plan has been foreseen.
Overall length axis motorway: 48.915 km.
Geometrical characteristics of the track studied for the design speed:140 km/h.
The new highway comprises 4 main viaducts and 2 main-cut and cover tunnels
Road platform: with three-way two-lane in each direction plus an emergency lane.
Michela Chiorboli was the Project Manager for the Technical Advising of the contractual design (produced from the General Contractor) and Project Manager Assistant for the High Surveillance during construction phase.
OWNER
BreBeMi S.p.a.
​
LOCATION
NORTHERN ITALY
​
YEAR
2008 - 2014
​
CLIENT
Michela Chiorboli worked as Project Manager at Metropolitana Milanese S.p.a.
(Società di Progetto BreBeMi was Metropolitana Milanese’s Client)
​
PROJECT VALUE
1322 Mio EUR.
​
TYPE OF WORK
Highway, special geotechnical works, foundation piles, pile wall, landslide stabilization, monitoring, bridge, viaducts, tunnels